Locating faults in medium voltage cables on wind farms

Case Study

 

Discover the challenges and solutions in our latest case study on renewable power generation plants. Renewable power generation plants are often installed in remote, hard-to-reach locations far from grid connection points, necessitating extensive cable installations. Unfortunately, there are instances where lower-quality labor and improper procedures led to non-compliance with technical specifications. 

These issues have caused premature problems, particularly affecting the insulation of underground medium voltage cables and hindering their operation. Download our case study to learn more about these critical issues and the strategies used to overcome them.

Document Center

Contact Form