Skip to main content

Partial Discharge Testing - Transformers

Advanced PD testing for early insulation fault detection in transformers.

Identify insulation defects with advanced Partial Discharge Testing solutions for power, distribution, and instrument transformers. Ensure reliability with on-site monitoring, factory acceptance testing, and cutting-edge diagnostic tools. 

Improved Safety via Early Insulation Detection

Megger’s PD testing identifies insulation defects early across windings, bushings, and tap changers, helping prevent dangerous failures. By detecting degradation before it escalates, operators can minimise risks and protect critical transformer infrastructure.

Strengthen Transformer Reliability

With advanced PD visibility, on-site diagnostics, and continuous monitoring, Megger enables proactive maintenance that reduces downtime and extends asset lifespans. These tools ensure dependable performance in power, distribution, and instrument transformers.

Actionable Diagnostic Insights

Megger’s cutting-edge diagnostic tools deliver precise PD signals with excellent signal‑to‑noise ratios, offering clear insight into insulation condition. These data-driven assessments support informed decisions throughout factory testing, monitoring, and field investigations.

Frequently Asked Questions

Partial discharge testing is a diagnostic method to detect and locate electrical insulation defects within high-voltage assets. These faults, if left unaddressed, can lead to significant failures in transformers, switchgear, and rotating machines. By assessing insulation health, partial discharge testing helps prevent costly outages and maintain asset reliability. 

Insulation failures account for over 50% of high-voltage asset failures. Detecting partial discharges early helps identify signs of degradation before faults develop, allowing for proactive maintenance, extended asset lifespans, and reduced downtime. 

Megger offers a comprehensive portfolio of tools, including portable monitoring devices, on-site diagnostic systems, and permanent online monitoring solutions. We also provide centralised architectures for efficient data analysis and expert-level consulting services. 

Yes, Megger provides flexible on-site solutions tailored to your equipment and infrastructure. Our services include installation, commissioning, and troubleshooting, performed by seasoned engineers to minimise downtime and maximise asset reliability. 

Find out more

Safeguard your critical infrastructure with precision diagnostics and monitoring. Explore our product range today or send us a message to learn more. 

Additional Resources

Expand your understanding of partial discharge testing with Megger’s in-depth technical content.

Advanced cable test and diagnostics in action

Advanced cable test and diagnostics in action: partial discharge diagnostics

Read more

Q & A

Q&A: Partial discharge testing

Read more

On or off line ?

On or off-line? Settling the debate on partial discharge measurements

Read more