About the product
- Direct two-channel digital reading (1 µΩ to 2000 Ω)
- DC test current up to 10 A maximum
- 0.25 % measurement accuracy
- Integrated demagnetization feature
- Tests operation of on-load tap changers
- Very fast auto safety discharge circuit
The MTO210 transformer ohmmeter is a line-operated, field-portable instrument designed specifically to measure the DC resistance of all types of magnetic windings safely and accurately. It can test transformers and rotating machine windings and perform low-current resistance measurements on connections, contacts and control circuits.
The dual set of potential inputs measures the resistance of the primary and secondary windings of a single- or three-phase transformer simultaneously. This dual reading, dual injection characteristic, also helps to speed up the measurements when used to test low voltage windings on large three-phase power transformers.
The MTO210 is extremely useful when testing the windings and contact resistance of tap changers with 'make-before-break' contacts and voltage regulators. This action will check for pitted or misaligned contacts as the instrument will give an indication if either condition occurs. You are also protected by the auto-shutdown safety feature and any inadvertent disconnection of a test lead or loss of power to the instrument will safely discharge the energy stored in the unit under test (UUT).
Technical specifications
- Automation
- No
- Max output current (DC)
- 10 A
- Single-phase/3-phase capability
- Single-phase
Product documents
Software and firmware updates
MTO 210/330 Firmware and Software Updates
The Megger Valley Forge, USA factory and select Megger Authorized Service Centers (ASCs) can perform updates. If you do not feel capable of performing updates properly, please contact your nearest Megger sales representative for information on where to return your instrument for updates.
Carefully read all instructions and backup your data before performing any updates.
Only update the firmware or software if you are experiencing difficulty with your instrument or if you have a specific need to do so.
!! WARNING !!
Incorrect installation of updates and incomplete updates may cause an error and make the equipment unusable.
If damage occurs from improper updates, customer is responsible for repair costs.
MTO210 Upgrade Installer
latest version
MTO210
1. Install PowerDB Upgrade (11) [optional]
2. Install Firmware Upgrade:
a. MTO 210 Upgrade Instructions
b. Download MTO 210 Upgrade Installer
MTO330 Brother PocketJet 6 Installer
MTO300/330
1. PowerDB PC Upgrade [Optional]. DO NOT INSTALL THIS ON THE MTO 330
2. Download Brother PocketJet 6 Installer [Accessories]:
a. MTO 330 Brother PocketJet 6 Install Instructions
b. Download MTO 330 Brother PocketJet 6 Installer