Tentative Agenda
Day 1
Joint Session
Opening
20 to 30 Minutes - Creating & Merging Subsets
10 Minutes - New Accessories
Basic Track (Run Concurrently with Advanced)
5 1/2 hours - Manual testing using the TVI
1 1/2 hours - AVTS - Basic Concepts
Advanced Track (Run Concurrently with Basic Track)
7 hours - Create a Transformer Differential Relay Test Module from scratch. Then verify and troubleshoot the module on a relay
Evening Open house
• End to End demonstration (line sync, common mode and live (if possible))
• Hardware & Software demos
• General Q & A
Day 2
Joint Session
Opening
20 to 30 Minutes - Common mistakes
Basic Track (Run Concurrently with Advanced)
7 hours - Build Basic over-current relay test module discussing all controls in detail
• Theoretical Control - Digitizing a new curve
• Trouble Shooting an over-current module
• Paralleling currents when only one current is used
• Testing UV with AVTS (time permiting)
Advanced Track (Run Concurrently with Basic Track)
7 hours - Create a Distance Relay Test Module from scratch. Then verify and troubleshoot the module on a relay
Note: 2 - 15 minute coffee breaks, 1 - 30 minute lunch